  • Rough Cut Capacity Planning — (RCCP) is a term used in relationship with production planning and controlling an environment. (RCCP) is also an important part of the manufacturing process within a companies Supply Chain by evaluating capacity with availability within a… …   Wikipedia

  • Cut-to-length logging — (CTL) is a mechanized harvesting system in which trees are delimbed and cut to length directly at the stump. CTL is typically a two man, two machine operation with a harvester felling, delimbing, and bucking trees and a forwarder transporting the …   Wikipedia

  • Cut-throat competition — Cut throat competition, also known as destructive or ruinous competition, refers to situations when competition results in prices that do not chronically or for extended periods of time cover costs of production, particularly fixed costs. This… …   Wikipedia

  • «Черновое» (укрупненное) планирование мощностей (ROUGH-CUT CAPACITY PLANNING, RCCP)  — Процесс преобразования объемно календарного плана на основе потребности в ключевых ресурсах, часто включая трудозатраты, оборудование, складское пространство, потенциал поставщиков и, в некоторых случаях, денежные средства. Для каждого ключевого… …   Словарь терминов по управленческому учету

  • Cut (graph theory) — In graph theory, a cut is a partition of the vertices of a graph into two disjoint subsets. The cut set of the cut is the set of edges whose end points are in different subsets of the partition. Edges are said to be crossing the cut if they are… …   Wikipedia

  • capacity — A lending and credit analysis term that describes a borrower s or applicant s ability to meet debt service obligations. See debt service coverage. American Banker Glossary credit grantor s measurement of a person s ability to repay loans.… …   Financial and business terms

  • Cut and fill — A mass haul diagram where land and rock cuts are hauled to fills In earthmoving, cut and fill is the process of constructing a railway, road or canal whereby the amount of material from cuts roughly matches the amount of fill needed to make… …   Wikipedia

  • Планирование потребности в производственных мощностях (CAPACITY REQUIREMENTS PLANNING, CRP)  — Функция планирования, предназначенная для определения, измерения и коррекции необходимых ограничений мощности или уровней мощности. Данный термин в MRP II относится к процессу детального определения количества труда и производственных ресурсов,… …   Словарь терминов по управленческому учету

  • Max-flow min-cut theorem — In optimization theory, the max flow min cut theorem states that in a flow network, the maximum amount of flow passing from the source to the sink is equal to the minimum capacity which when removed in a specific way from the network causes the… …   Wikipedia

  • Lackawanna Cut-Off — The westbound Lackawanna Limited comes off the Pequest Fill shortly after the opening of the Lackawanna Cut Off. Taken from the signal tower at the east end of Greendell Siding, this early 1912 photo was used as a template for a Phoebe Snow… …   Wikipedia

  • Tax cut — A tax cut is a reduction in taxes. Economic stimulus via tax cuts, along with interest rate intervention and deficit spending, are one of the central tenets of Keynesian economics.Economic theoryThe immediate effects of a tax cut are not,… …   Wikipedia